Start by aligning longer facades toward the sun in cold climates and limiting west glass where late‑day heat spikes occur. Set glazing ratios by room function, then add tuned overhangs or exterior shades. In one coastal infill, fixed awnings paired with selective low‑SHGC glazing kept peak summer room temperatures down by several degrees without touching mechanical settings. Document these moves in the permit set so shading isn’t value‑engineered out during pricing pressures.
A modest amount of interior mass can smooth daily swings, but only when sunlight can reach it and night flushing is realistic. Consider polished concrete or dense interior partitions where they make architectural sense. Avoid heavy, complex structures that slow schedules or require costly foundations. In a compact urban home, a simple tiled wall behind south glazing provided enough mass to temper afternoon spikes, while staying fully compatible with trades, finishes, and moisture management goals throughout the residence.
Use quick daylight modeling early to test skylight positions, light‑shelf depth, and interior reflectances. Aim for even illumination in work zones and warm highlights in living areas. Establish glare thresholds and check them against seasonal sun paths. On a recent retrofit, shifting a single skylight by half a bay eliminated harsh reflections on a workstation, improving comfort without adding fixtures. Share renderings with owners to build confidence and align expectations before final framing decisions are locked.
Use realistic production assumptions and a target annual balance, not optimistic marketing figures. Coordinate with the structural engineer for attachment spacing, point loads, and uplift. Decide on string versus microinverters based on shading and maintenance preferences. Pre‑wire pathways that avoid air barrier disruptions. In a wooded lot project, a modest array paired with conservation crushed the bill, while careful rafter planning prevented costly retrofits and preserved the airtight roof assembly exactly as documented in construction details.
Circuit‑level monitoring uncovers sneaky loads and supports automatic scheduling. Water heating can shift to sunny hours, while EV charging can pause during peak pricing. Label critical loads and map backup priorities in the panel cover. Share a simple guide with homeowners so outages are predictable and stress‑free. Over time, trend data validates design assumptions, helping future projects dial insulation, equipment sizing, and PV capacity with increasing confidence grounded in measured, lived performance, not abstract calculations alone.
Run spare conduits from roof to mechanical room and garage, oversize subpanels modestly, and keep clear wall space for batteries. Consider bi‑directional EV readiness and transfer switches that maintain code compliance. Future‑proofing is inexpensive during construction and liberating later. One client delayed batteries initially yet added them two years later without drywall surgery, thanks to labeled chases and thoughtful equipment placement. Plan today so tomorrow’s upgrades feel like plugging in, not tearing apart carefully finished spaces.